15 issues (filtered)12 topics
MediumRoads

San Bernabe Drive road widening and Don Dahvee Park trail crossing

A neighborhood project first proposed around 2002 finally got its $1.1 million construction contract, thanks to NCIP funding and years of neighbor advocacy.

1 mention (1 this month)Last discussed Oct 20, 2026
HighRoads

North Fremont sidewalk gap closure project added to CIP

After 40+ years of advocacy, the city accepted $2.86M from TAMC to build a pedestrian and bike bridge closing the sidewalk gap between Casanova and the city limit, connecting to the Fort Ord Regional Trail. Maintenance with Seaside and design details come back later.

4 mentions (2 this month)Last discussed Oct 20, 2026
MediumRoads

Area-wide parking solutions on North Fremont

The council approved $274,000 for smart parking meters to replace manual ones, despite one resident's objection that microwave radiation from the meters poses health risks.

2 mentions (1 this month)Last discussed Oct 20, 2026
MediumRoads

Olmsted Road right-of-way vacation

The city wants to give up a roughly 17,200-square-foot stretch of Olmsted Road near Garden Road that basically serves as the airport's driveway. Maintenance would shift to the airport district, saving the city money. The City Council makes the final call.

3 mentions (1 this month)Last discussed Oct 20, 2026
MediumRoads

Figueroa Street alleyway flooding

A business owner says a city curb-cut rebuild flattened the alley drainage, causing repeated floods costing $7,000-$8,000. He wants the original V-cut restored.

2 mentions (2 this month)Last discussed Oct 6, 2026
HighRoads

Madison/Herrmann/Larkin Intersection Safety Project Halted

A quick-build safety project near Monterey High hit a wall of neighborhood complaints about lack of outreach. The council kept the grant money but added outreach, a grant extension, a later build date, and a required return for final approval.

36 mentionsLast discussed Sep 22, 2026
MediumRoads

Cass and El Dorado Street rehabilitation

A long-awaited repaving of Cass Street with new ADA curb ramps is funded and contracted, timed after Cal Am's water main replacement. Bus routes will be detoured during roughly ten weeks of construction.

1 mentionLast discussed Sep 1, 2026
MediumRoads

New stop controls on Pinehill Way and Ragsdale

New stop signs are coming to Pinehill Way at Skyline Drive and at the Ragsdale/Wilson Road intersections, plus yield control changes on Ragsdale — aimed at safety and better traffic flow.

1 mentionLast discussed Aug 18, 2026
LowRoads

Neighborhood Improvement Program projects delivered

Commissioner Freeman celebrated that NCIP money is finally building things: the Via Paraiso Park basketball court is done, and the Monterey High School intersection fix is funded and moving forward.

1 mentionLast discussed Jun 23, 2026
HighRoads

Citywide Road Surface Repair Project FY26

A $3.83 million contract with McKim Corporation will repair streets across Monterey — a big win for drivers tired of rough roads.

1 mentionLast discussed Jun 16, 2026
MediumRoads

Patriotic crosswalk and decorative crosswalk policy

A community group wants a red, white and blue crosswalk downtown for the July 4th celebration of America's 250th anniversary, paid for by private donations. The council split 2-2 but sent it to June 16, with a review of the ambiguous crosswalk policy to come later.

7 mentionsLast discussed Jun 2, 2026
HighRoads

Skyline Forest Drive and Highway 68 Intersection Safety

Skyline Forest residents again pressed the Council on the dangerous Highway 68 intersection, saying a safety study funded a year ago has stalled after Caltrans changed requirements. The City Manager committed to a full staff update and possible future agenda item.

4 mentionsLast discussed May 27, 2026
MediumRoads

Traffic Signal Removal at Prescott and Taylor

The old Presidio-gate signal at Prescott and Taylor will come down, replaced by an all-way stop. A 60-year resident and civil engineer objected that forcing everyone to stop is counterproductive, but the council agreed the step-down approach protects pedestrians near Campagnos and meets the April 2029 ADA deadline.

1 mentionLast discussed May 19, 2026
HighRoads

Residential Parking Permit Program Refinements

Months after the new RPP rollout confused residents, the council approved five fixes: existing zones keep their programs without re-qualifying, opt-out threshold drops to 70%, guest passes are $25 flat, landlord permits are separate, and Cannery Row eligibility got simpler. Residents pushed for a 'keep it as-is' option and raised surveillance and data-privacy questions.

1 mentionLast discussed May 19, 2026
HighRoads

North Fremont gridlock and traffic signal sync

Longtime neighborhood advocate Richard Ruccello says peak-hour gridlock on North Fremont from uncoordinated Monterey, Caltrans and Seaside signal systems is hurting businesses, residents and evacuation routes, and wants the three jurisdictions brought together.

2 mentionsLast discussed May 12, 2026